{"id":18378,"date":"2024-04-20T03:03:17","date_gmt":"2024-04-20T03:03:17","guid":{"rendered":"https:\/\/energybuzz.ph\/staging\/6915\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/"},"modified":"2024-04-20T03:03:17","modified_gmt":"2024-04-20T03:03:17","slug":"first-geothermal-well-a-success-for-mtu-facility-in-munich-germany","status":"publish","type":"post","link":"https:\/\/energybuzz.ph\/staging\/6915\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/","title":{"rendered":"First geothermal well a success for MTU facility in Munich, Germany"},"content":{"rendered":"<div>\n<p>Drilling and pump testing of the first well drilled for the geothermal heating project of aircraft engine manufacturer <a href=\"https:\/\/www.mtu.de\/\">MTU Aero Engines AG<\/a> (MTU) in Munich, Germany has been completed, with data so far indicating a productive well. The drilling rig will then be skidded to the location of the second well, which will be drilled by mid-April.<\/p>\n<p><a href=\"https:\/\/www.thinkgeoenergy.com\/german-aircraft-engine-firm-targets-potential-geothermal-exploration-for-heating\/\">First reported in 2020<\/a>, the geothermal project aims to supply process and space heating for the buildings of MTU, reducing the current fossil fuel usage by up to 88%. <a href=\"https:\/\/www.erdwerk.com\/\">ERDWERK<\/a> has been managing the project since 2020, starting with the basic investigation, support in the mining approval process including the application for the Karlsfeld-Ost permit field, the feasibility study, detailed planning, and the tendering process. German drilling company\u00a0<a href=\"https:\/\/daldrup.eu\/en\/?id_seite=1\">Daldrup &amp; S\u00f6hne AG<\/a> has been awarded the general contract for the construction of the geothermal doublet.<\/p>\n<p>Drilling for the MTU <a href=\"https:\/\/www.thinkgeoenergy.com\/geothermal-drilling-starts-for-munich-aero-engine-manufacturing-facility\/\">officially started at the end of January 2024<\/a>. With a total distance of 2650 meters, the first borehole (Allach Th1) was deviated to the south and hit the Malm formation on the 18th of March after almost two months of drilling. Mud losses during drilling in the Malm were early indications of good hydraulic conditions.<\/p>\n<p>Short-term pumping tests indicated a productivity index (PI) of over 50 L\/s\/bar at approximately 120 L\/s. This makes Allach Th1 one of the most best Malm wells in terms of hydraulic performance in the Molasse Basin. The data obtained so far indicates a very productive borehole, with a very good flow rate of well over 100 liters per second and a temperature of around 70\u00b0C.<\/p>\n<p>With this drilling, the very good hydraulic properties of the Malm thermal water reservoir were demonstrated for the first time in the northwest of Munich (and at the project site of the MTU plant in Munich-Allach).<\/p>\n<p>Source: <a href=\"https:\/\/www.mtu.de\/about-us\/corporate-responsibility\/manufacturing-maintenance\/geothermal-energy\/\">MTU Aero Engines<\/a> and <a href=\"https:\/\/www.erdwerk.com\/de\/bohrung-allach-th1-fuendig\">Erdwerk GmbH<\/a><\/p>\n<p>The post <a href=\"https:\/\/www.thinkgeoenergy.com\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/\">First geothermal well a success for MTU facility in Munich, Germany<\/a> first appeared on <a href=\"https:\/\/www.thinkgeoenergy.com\/\">ThinkGeoEnergy &#8211; Geothermal Energy News<\/a>.<\/div>\n","protected":false},"excerpt":{"rendered":"<div>\n<p>The first geothermal borehole drilled at the MTU Aero Engines site in Munich, Germany has shown good temperature and hydraulic performance.<\/p>\n<p>The post <a href=\"https:\/\/www.thinkgeoenergy.com\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/\">First geothermal well a success for MTU facility in Munich, Germany<\/a> first appeared on <a href=\"https:\/\/www.thinkgeoenergy.com\/\">ThinkGeoEnergy &#8211; Geothermal Energy News<\/a>.<\/div>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"nf_dc_page":"","footnotes":""},"categories":[1],"tags":[4467,7631,1188,168,14670,14669,13088,17447,14677,3967,7490,3235],"class_list":["post-18378","post","type-post","status-publish","format-standard","hentry","category-uncategorized","tag-energy","tag-facility","tag-first","tag-for","tag-geo","tag-geothermal","tag-germany","tag-mtu","tag-munich","tag-success","tag-think","tag-well"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.0 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>First geothermal well a success for MTU facility in Munich, Germany - Energy Buzz<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"First geothermal well a success for MTU facility in Munich, Germany - Energy Buzz\" \/>\n<meta property=\"og:description\" content=\"The first geothermal borehole drilled at the MTU Aero Engines site in Munich, Germany has shown good temperature and hydraulic performance. The post First geothermal well a success for MTU facility in Munich, Germany first appeared on ThinkGeoEnergy - Geothermal Energy News.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/\" \/>\n<meta property=\"og:site_name\" content=\"Energy Buzz\" \/>\n<meta property=\"article:published_time\" content=\"2024-04-20T03:03:17+00:00\" \/>\n<meta name=\"author\" content=\"admin\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"admin\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/\"},\"author\":{\"name\":\"admin\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#\\\/schema\\\/person\\\/344f8dbaaecf75e51367eef93f492892\"},\"headline\":\"First geothermal well a success for MTU facility in Munich, Germany\",\"datePublished\":\"2024-04-20T03:03:17+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/\"},\"wordCount\":337,\"publisher\":{\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#organization\"},\"keywords\":[\"energy\",\"facility\",\"first\",\"for\",\"geo\",\"geothermal,\",\"germany\",\"mtu\",\"munich,\",\"success\u2019\",\"think\",\"well\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/\",\"url\":\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/\",\"name\":\"First geothermal well a success for MTU facility in Munich, Germany - Energy Buzz\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#website\"},\"datePublished\":\"2024-04-20T03:03:17+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/energybuzz.ph\\\/staging\\\/6915\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"First geothermal well a success for MTU facility in Munich, Germany\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#website\",\"url\":\"https:\\\/\\\/energybuzz.ph\\\/\",\"name\":\"Energy Buzz\",\"description\":\"\",\"publisher\":{\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/energybuzz.ph\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#organization\",\"name\":\"Energy Buzz\",\"url\":\"https:\\\/\\\/energybuzz.ph\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/energybuzz.ph\\\/staging\\\/6915\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/EnergyBuzzLogo.png\",\"contentUrl\":\"https:\\\/\\\/energybuzz.ph\\\/staging\\\/6915\\\/wp-content\\\/uploads\\\/2023\\\/09\\\/EnergyBuzzLogo.png\",\"width\":1315,\"height\":656,\"caption\":\"Energy Buzz\"},\"image\":{\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/energybuzz.ph\\\/#\\\/schema\\\/person\\\/344f8dbaaecf75e51367eef93f492892\",\"name\":\"admin\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/136dede3a147ecd1a9946f78a827dcc4c82e31eece4650a789bbb3656cebe664?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/136dede3a147ecd1a9946f78a827dcc4c82e31eece4650a789bbb3656cebe664?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/136dede3a147ecd1a9946f78a827dcc4c82e31eece4650a789bbb3656cebe664?s=96&d=mm&r=g\",\"caption\":\"admin\"},\"url\":\"https:\\\/\\\/energybuzz.ph\\\/staging\\\/6915\\\/author\\\/admin\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"First geothermal well a success for MTU facility in Munich, Germany - Energy Buzz","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/","og_locale":"en_US","og_type":"article","og_title":"First geothermal well a success for MTU facility in Munich, Germany - Energy Buzz","og_description":"The first geothermal borehole drilled at the MTU Aero Engines site in Munich, Germany has shown good temperature and hydraulic performance. The post First geothermal well a success for MTU facility in Munich, Germany first appeared on ThinkGeoEnergy - Geothermal Energy News.","og_url":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/","og_site_name":"Energy Buzz","article_published_time":"2024-04-20T03:03:17+00:00","author":"admin","twitter_card":"summary_large_image","twitter_misc":{"Written by":"admin","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/#article","isPartOf":{"@id":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/"},"author":{"name":"admin","@id":"https:\/\/energybuzz.ph\/#\/schema\/person\/344f8dbaaecf75e51367eef93f492892"},"headline":"First geothermal well a success for MTU facility in Munich, Germany","datePublished":"2024-04-20T03:03:17+00:00","mainEntityOfPage":{"@id":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/"},"wordCount":337,"publisher":{"@id":"https:\/\/energybuzz.ph\/#organization"},"keywords":["energy","facility","first","for","geo","geothermal,","germany","mtu","munich,","success\u2019","think","well"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/","url":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/","name":"First geothermal well a success for MTU facility in Munich, Germany - Energy Buzz","isPartOf":{"@id":"https:\/\/energybuzz.ph\/#website"},"datePublished":"2024-04-20T03:03:17+00:00","breadcrumb":{"@id":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/energybuzz.ph\/first-geothermal-well-a-success-for-mtu-facility-in-munich-germany\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/energybuzz.ph\/staging\/6915\/"},{"@type":"ListItem","position":2,"name":"First geothermal well a success for MTU facility in Munich, Germany"}]},{"@type":"WebSite","@id":"https:\/\/energybuzz.ph\/#website","url":"https:\/\/energybuzz.ph\/","name":"Energy Buzz","description":"","publisher":{"@id":"https:\/\/energybuzz.ph\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/energybuzz.ph\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/energybuzz.ph\/#organization","name":"Energy Buzz","url":"https:\/\/energybuzz.ph\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/energybuzz.ph\/#\/schema\/logo\/image\/","url":"https:\/\/energybuzz.ph\/staging\/6915\/wp-content\/uploads\/2023\/09\/EnergyBuzzLogo.png","contentUrl":"https:\/\/energybuzz.ph\/staging\/6915\/wp-content\/uploads\/2023\/09\/EnergyBuzzLogo.png","width":1315,"height":656,"caption":"Energy Buzz"},"image":{"@id":"https:\/\/energybuzz.ph\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/energybuzz.ph\/#\/schema\/person\/344f8dbaaecf75e51367eef93f492892","name":"admin","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/136dede3a147ecd1a9946f78a827dcc4c82e31eece4650a789bbb3656cebe664?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/136dede3a147ecd1a9946f78a827dcc4c82e31eece4650a789bbb3656cebe664?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/136dede3a147ecd1a9946f78a827dcc4c82e31eece4650a789bbb3656cebe664?s=96&d=mm&r=g","caption":"admin"},"url":"https:\/\/energybuzz.ph\/staging\/6915\/author\/admin\/"}]}},"_links":{"self":[{"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/posts\/18378","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/comments?post=18378"}],"version-history":[{"count":0,"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/posts\/18378\/revisions"}],"wp:attachment":[{"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/media?parent=18378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/categories?post=18378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/energybuzz.ph\/staging\/6915\/wp-json\/wp\/v2\/tags?post=18378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}